Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Capital cost: low and high sulfur coal plants; 800 MWe

Technical Report ·
DOI:https://doi.org/10.2172/5285471· OSTI ID:5285471
The Commercial Electric Power Cost Study for 800-MWe (Nominal) low- and high-sulfur coal plants consists of three volumes. (This the fourth subject in a series of eight performed in the Commercial Electric Power Cost Studies by the US NRC). The low-sulfur coal plant is described in Volumes I and II (this volume), while Volume III describes the high-sulfur coal plant. The design basis and cost estimate for the 801-MWe low-sulfur coal plant is presented in Volume I and the drawings, equipment list, and site description are contained in this document. The design basis, drawings, and summary cost estimate for a 794-MWe high-sulfur coal plant are presented in Volume III. This information was developed by redesigning the low-sulfur sub-bituminous coal plant for burning high-sulfur bituminous coal. The reference design includes a lime flue gas desulfurization system. These coal plants utilize a mechanical draft (wet) cooling tower system for condenser heat removal. Costs of alternate cooling systems are provided in Report No. 7 in this series of studies of costs of commercial electrical power plants.
Research Organization:
United Engineers and Constructors, Inc., Philadelphia, Pa. (USA)
OSTI ID:
5285471
Report Number(s):
COO-2477-8(Vol.2); NUREG-0244(Vol.2)
Country of Publication:
United States
Language:
English