Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Capital cost: low- and high-sulfur coal plants, 800 MWe

Technical Report ·
DOI:https://doi.org/10.2172/5247825· OSTI ID:5247825
This Commercial Electric Power Cost Study for 800-MWe (Nominal) high- and low-sulfur coal plants consists of three volumes. The low-sulfur coal plant is described in Volumes I and II, while Volume III describes the high-sulfur coal plant. The design basis and cost estimate for the 801-MWe low sulfur coal plant is presented in Volume I, and the drawings, equimpment list, and site description are contained in Volume II. The design basis, drawings, and summary cost estimate for a 794-MWe high-sulfur coal plant are presented in Volume III. This information was developed by redesigning the low-sulfur sub-bituminous coal plant for burning high-sulfur bituminous coal. The reference design includes a lime flue-gas desulfurization system. These coal plants utilize a mechanical draft (wet) cooling tower system for condenser heat removal.
Research Organization:
United Engineers and Constructors, Inc., Philadelphia, Pa. (USA)
OSTI ID:
5247825
Report Number(s):
COO-2477-8(Vol.1); NUREG-0244(Vol.1)
Country of Publication:
United States
Language:
English