Total cost of 46-Mw Borax cogen system put at $30M
Journal Article
·
· Gas Turbine World; (United States)
OSTI ID:5282995
The cogeneration system, designed around a W-251B gas turbine power plant exhausting into a Deltak waste heat boiler to produce ''free'' process steam from the gas turbine exhaust, is discussed. The design includes water injection for NO/sub x/ control, self-cleaning inlet air filters, evaporative coolers, supercharger, and supplementary firing of the waste heat boiler. Once the system is operational Borax will be able to generate all of the electricity needed for on-site operations and a large share of process steam needs--plus still have 22-23 Mw surplus electric power to sell, so that the installation should pay for itself in less than 5 years of service.
- Research Organization:
- Gas Turbine World, Fairfield, CT
- OSTI ID:
- 5282995
- Journal Information:
- Gas Turbine World; (United States), Journal Name: Gas Turbine World; (United States) Vol. 13:1; ISSN GTWOD
- Country of Publication:
- United States
- Language:
- English
Similar Records
2. 8 MW cogen plant will pay for itself in 3 years
Borax spends $30M for cogeneration system. [US Borax and Chemical Corp]
GM and Amtrak opt for combined-cycle cogeneration: Amtrak sells 100% of electricity, expects 2. 8-year payback
Journal Article
·
Sat May 01 00:00:00 EDT 1982
· Gas Turbine World; (United States)
·
OSTI ID:6609691
Borax spends $30M for cogeneration system. [US Borax and Chemical Corp]
Journal Article
·
Mon Sep 20 00:00:00 EDT 1982
· Energy User News; (United States)
·
OSTI ID:6663452
GM and Amtrak opt for combined-cycle cogeneration: Amtrak sells 100% of electricity, expects 2. 8-year payback
Journal Article
·
Mon Jun 10 00:00:00 EDT 1985
· Energy User News; (United States)
·
OSTI ID:5681542