Solvent refined coal (SRC) process. Monthly report, November 1977

Technical Report ·
DOI:https://doi.org/10.2172/5256210· OSTI ID:5256210
The Fort Lewis Pilot Plant processed coal during 28 days of SRC II operation in November. The feed coal on November 1 was Illinois No. 6 coal from Peabody's River King Mine. On November 2, the feed was switched to Pittsburgh seam coal from Consol's Blacksville No. 2 Mine. Four material balance runs were completed on the Pittsburgh seam coal. At the Merriam Laboratory three additional SRC II runs were completed on the Blacksville coal. These provided information on the effect of varying dissolver temperature and the effect of dissolver residence time.