Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Steam Generator Group Project. Semiannual progress report, July-December 1982

Technical Report ·
DOI:https://doi.org/10.2172/5244778· OSTI ID:5244778
The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant as a vehicle for research on a variety of safety and reliability issues. This report is a semi-annual summary of progress of the program. Information is presented on positioning the generator into the Steam Generator Examination Facility, and examination of the secondary side to confirm pretransport generator condition. The report then presents radiological field mapping results and personnel exposure monitoring data. Radiation field reduction achieved in channel head decontamination efforts is reported. The results of a profilometry examination to determine the extent of denting are summarized. Plans for unplugging of selective explosively plugged tubes are discussed.
Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5244778
Report Number(s):
NUREG/CR-3580; PNL-4692; ON: DE84006872
Country of Publication:
United States
Language:
English