Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

Technical Report ·
DOI:https://doi.org/10.2172/519153· OSTI ID:519153

Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

Research Organization:
Oak Ridge Y-12 Plant, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OS21400
OSTI ID:
519153
Report Number(s):
Y/TS--1611; ON: DE97008513
Country of Publication:
United States
Language:
English