Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

Technical Report ·
DOI:https://doi.org/10.2172/665857· OSTI ID:665857
The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.
Research Organization:
Oak Ridge Y-12 Plant, TN (United States); Science Applications International Corp., Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
665857
Report Number(s):
Y/SUB--97-99069C(Y27)/1; ON: DE98054362
Country of Publication:
United States
Language:
English