Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

MHF treatment design-3: Logistical planning excludes human error and mechanical failure

Journal Article · · Oil Gas J.; (United States)
OSTI ID:5171073
To successfully achieve the goal of a cost-effective MHF treatment, careful logistical planning is required. Logistical planning often receives too little attention and may be a major cause of treatment failure. The four categories of logistical planning are: wellsite design, standby equipment, frac fluid quality control, and mechanical considerations. MHF well site design and layout should be made prior to building the location, if possible. The size of the location should be based on average treatment size and equipment required for other treatments in the area. It is more economical to build the location as per design before drilling operations commence than to modify the location just prior to stimulation.
Research Organization:
The Western Co. of North America, Midland, TX
OSTI ID:
5171073
Journal Information:
Oil Gas J.; (United States), Journal Name: Oil Gas J.; (United States) Vol. 81:34; ISSN OIGJA
Country of Publication:
United States
Language:
English