Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Rulison Site groundwater monitoring report fourth quarter, 1996. Revision 4

Technical Report ·
DOI:https://doi.org/10.2172/515503· OSTI ID:515503
Project Rulison, a joint US Atomic Energy Commission (AEC) and Austral Oil Company (Austral) experiment, was conducted under the AEC`s Plowshare Program to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability, gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface. This report summarizes the results of the fourth quarter 1996 groundwater sampling event for the Rulison Site, which is located approximately 65 kilometers (km) (40 miles [mi]) northeast of Grand Junction, Colorado. The sampling was performed as part of a quarterly groundwater monitoring program implemented by the US Department of Energy (DOE) to monitor the effectiveness of remediation of a drilling effluent pond located at the site. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for a 1969 gas stimulation test.
Research Organization:
USDOE Nevada Operations Office, Las Vegas, NV (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC08-97NV13052
OSTI ID:
515503
Report Number(s):
DOE/NV--460-Rev.4; ON: DE97004942
Country of Publication:
United States
Language:
English

Similar Records

Rulison Site groundwater monitoring report, third quarter, 1997
Technical Report · Wed Oct 01 00:00:00 EDT 1997 · OSTI ID:564060

Rulison Site groundwater monitoring report, third quarter 1996
Technical Report · Fri Jan 31 23:00:00 EST 1997 · OSTI ID:446303

Rulison Site corrective action report
Technical Report · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:441657