Rulison Site groundwater monitoring report, third quarter 1996
Project Rulison, a joint AEC and Austral experiment, was conducted under the AEC`s Plowshare Program to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability, gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface. Natural gas production testing was conducted in 1970 and 1971. This report summarizes the results of the third quarter 1996 groundwater sampling event for the Rulison Site, which is located approximately 65 kilometers northeast of Grand Junction, Colorado. The sampling was performed as part of a quarterly groundwater monitoring program implemented by the US Department of Energy (DOE) to monitor the effectiveness of remediation of a drilling effluent pond located at the site. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for a 1969 gas stimulation test.
- Research Organization:
- USDOE Nevada Operations Office, Las Vegas, NV (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC08-92NV10972
- OSTI ID:
- 446303
- Report Number(s):
- DOE/NV--460; ON: DE97004303
- Country of Publication:
- United States
- Language:
- English
Similar Records
Rulison Site groundwater monitoring report, third quarter, 1997
Rulison Site groundwater monitoring report fourth quarter, 1996. Revision 4
Rulison Site corrective action report
Technical Report
·
Wed Oct 01 00:00:00 EDT 1997
·
OSTI ID:564060
Rulison Site groundwater monitoring report fourth quarter, 1996. Revision 4
Technical Report
·
Mon Mar 31 23:00:00 EST 1997
·
OSTI ID:515503
Rulison Site corrective action report
Technical Report
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:441657