Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Gravimelt Process Development. Quarterly technical progress report

Technical Report ·
OSTI ID:5143808
During the current reporting period, the bench-scale Gravimelt system was completely installed and checked out for operation. Initial coal flow checkout was performed with aqueous zinc chloride as the leaching medium simulant and Illinois No. 6 coal as the feed. It was found that the coal moved through the system and drained at the outlet arm as designed. However, the aqueous zinc chloride tended to swell the coal causing plugging after about an hour's operation. It was found that the fused caustic did not swell the coal appreciably and the coal moves through the system essentially as designed with apparent excellent drainage occurring at the outlet arm. Downstream batch washing and centrifugation operations were also checked out and found to be satisfactory. The system is now deemed to be ready for shakedown operationa t 350/sup 0/C with fused caustic and Illinois No. 6 coal. The test readiness review information and schedule is presented in Appendix A and the test plan submitted for approval to the DOE project officer is presented in Appendix B.
Research Organization:
TRW Defense and Space Systems Group, Redondo Beach, CA (USA)
DOE Contract Number:
AC22-81PC42295
OSTI ID:
5143808
Report Number(s):
DOE/PC/42295-T3; ON: DE82016019
Country of Publication:
United States
Language:
English