Dispatch and unit commitment including commonly owned units
Journal Article
·
· IEEE Trans. Power Appar. Syst.; (United States)
This paper presents an approach to the problem of dispatch and unit commitment of wholly owned and commonly owned units. Operating strategies are described and modifications to conventional dispatch and unit commitment programs are examined. Dynamic programming is used as the basic technique to determine an optimum schedule for startup and shutdown of available generating units in addition to unit base generation and production costs.
- Research Organization:
- University of Pittsburgh, Department of Electrical Engineering, Pittsburgh, PA
- OSTI ID:
- 5115169
- Journal Information:
- IEEE Trans. Power Appar. Syst.; (United States), Journal Name: IEEE Trans. Power Appar. Syst.; (United States) Vol. PAS-104:9; ISSN IEPSA
- Country of Publication:
- United States
- Language:
- English
Similar Records
Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
Stochastic scheduling and control with applications to power system unit commitment. Final report
Solution method for unit commitment limitations and utility constraints
Journal Article
·
Mon Aug 01 00:00:00 EDT 1994
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:6911495
Stochastic scheduling and control with applications to power system unit commitment. Final report
Technical Report
·
Sun Nov 24 23:00:00 EST 1985
·
OSTI ID:6221975
Solution method for unit commitment limitations and utility constraints
Journal Article
·
Mon Dec 31 23:00:00 EST 1990
· IEEE Computer Applications and Power; (United States)
·
OSTI ID:5202334