Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Integrated safeguards and security for the INEL Special Isotope Separation Plant

Conference ·
OSTI ID:5114594
 [1];  [2]
  1. Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States)
  2. Los Alamos National Lab., NM (United States)
This paper describes the approach that was taken in developing safeguards and security design criteria to be used for the Special Isotope Separation (SIS) Production Plant. The US Department of Energy has postponed the construction of the SIS Production Plant that was to be built at the Idaho National Engineering Laboratory (INEL) site located near Idaho Falls, Idaho. The SIS Plant planned to isotopically enrich plutonium utilizing the Atomic Vapor Laser Isotope Separation (AVLIS) process developed at the Lawrence Livermore National Laboratory. Westinghouse Idaho Nuclear Co., Inc. as a prime contractor to the DOE Idaho Operations Office, was to operate the Plant.
Research Organization:
Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC07-84ID12435
OSTI ID:
5114594
Report Number(s):
WINCO-11632; CONF-901101--92; ON: DE92017498
Country of Publication:
United States
Language:
English