Integrated safeguards and security for the INEL Special Isotope Separation Plant
Conference
·
OSTI ID:10162014
- Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States)
- Los Alamos National Lab., NM (United States)
This paper describes the approach that was taken in developing safeguards and security design criteria to be used for the Special Isotope Separation (SIS) Production Plant. The US Department of Energy has postponed the construction of the SIS Production Plant that was to be built at the Idaho National Engineering Laboratory (INEL) site located near Idaho Falls, Idaho. The SIS Plant planned to isotopically enrich plutonium utilizing the Atomic Vapor Laser Isotope Separation (AVLIS) process developed at the Lawrence Livermore National Laboratory. Westinghouse Idaho Nuclear Co., Inc. as a prime contractor to the DOE Idaho Operations Office, was to operate the Plant.
- Research Organization:
- Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC07-84ID12435
- OSTI ID:
- 10162014
- Report Number(s):
- WINCO--11632; CONF-901101--92; ON: DE92017498
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated safeguards and security for the INEL Special Isotope Separation Plant
Integrated safeguards and security for the INEL Special Isotope Separation Plant
Integrated safeguards and security for the INEL Special Isotope Separation Plant
Conference
·
Tue Jun 12 00:00:00 EDT 1990
·
OSTI ID:5114594
Integrated safeguards and security for the INEL Special Isotope Separation Plant
Conference
·
Tue Oct 23 00:00:00 EDT 1990
·
OSTI ID:10163196
Integrated safeguards and security for the INEL Special Isotope Separation Plant
Conference
·
Tue Oct 23 00:00:00 EDT 1990
·
OSTI ID:5047294