Combined cycle comes to the Philippines
Journal Article
·
· Turbomachinery International
OSTI ID:50491
The first combined cycle power station in the Philippines has gone into operation at National Power Corporation`s (NPC) Limay Bataan site, some 40 km west of Manila. The plant comprises two 300 MW blocks in 3+3+1 configuration, based on ABB Type GT11N gas turbines. It was built by a consortium of ABB, with their Japanese licensee Kawasaki Heavy Industries, and Marubeni Corporation. This paper discusses Philippine power production, design and operation of the Limay Bataan plant, and conversion of an existing turbine of the nuclear plant project that was abandoned earlier, into a combined cycle operation. 6 figs.
- OSTI ID:
- 50491
- Journal Information:
- Turbomachinery International, Vol. 36, Issue 2; Other Information: PBD: Mar-Apr 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Feasibility of Hybrid Retrofits to Off-Grid Diesel Power Plants in the Philippines
Petrogenesis of western Philippine island arc magmas: potential origin of the potassium-depth relationship
Potential origin of the potassium depth relationship in the Bataan Orogene, the Philippines
Conference
·
Sun Aug 01 00:00:00 EDT 1999
·
OSTI ID:50491
+2 more
Petrogenesis of western Philippine island arc magmas: potential origin of the potassium-depth relationship
Conference
·
Tue Jan 01 00:00:00 EST 1985
· Geol. Soc. Am., Abstr. Programs; (United States)
·
OSTI ID:50491
Potential origin of the potassium depth relationship in the Bataan Orogene, the Philippines
Thesis/Dissertation
·
Tue Jan 01 00:00:00 EST 1985
·
OSTI ID:50491