Methods of detecting and locating tubing and packer leaks in the western operating area of the Prudhoe Bay field
Journal Article
·
· SPE Production and Facilities
Production in the Prudhoe Bay Unit Western Operating Area (WOA) began in June 1977. In the early years of field life few workovers were required. Most of these were to replace defective packers and thermocase tubing. An increasing number of mechanical failures of tubular components as well as worsening corrosivity of produced fluids has significantly increased the occurrences of tubing-annulus communication and corresponding workover requirements. In 1988--1989, 50 cases of tubing-annulus communication were found in the WOA. Of these, 5 were permanently repaired with wireline techniques and 3 were temporarily repaired until a workover could be implemented. The remaining 42 wells were shut in and worked over without attempting remedial measures. This paper discusses methods used at Prudhoe Bay for identifying problem wells and determining the exact location of the leak in naturally flowing, gas lifted, and injection wells.
- Sponsoring Organization:
- USDOE
- OSTI ID:
- 49278
- Journal Information:
- SPE Production and Facilities, Journal Name: SPE Production and Facilities Journal Issue: 2 Vol. 10; ISSN 1064-668X; ISSN SPRFEZ
- Country of Publication:
- United States
- Language:
- English
Similar Records
Improved coiled-tubing squeeze-cementing techniques at Prudhoe Bay
Wireline hydraulic isolation packer system
Evolution of development drilling in Prudhoe Bay
Journal Article
·
Sun Mar 31 23:00:00 EST 1991
· Journal of Petroleum Technology; (United States)
·
OSTI ID:5739238
Wireline hydraulic isolation packer system
Patent
·
Tue Aug 01 00:00:00 EDT 1989
·
OSTI ID:5463726
Evolution of development drilling in Prudhoe Bay
Journal Article
·
Mon Sep 01 00:00:00 EDT 1997
· JPT, Journal of Petroleum Technology
·
OSTI ID:536509