Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Performance of a 150-MW S-band klystron

Conference ·
OSTI ID:489687

As part of an international collaboration, the Stanford Linear Accelerator Center (SLAC) klystron group has designed, fabricated, and tested a 60-Hz, 3-{mu}s, 150-MW S-band klystron built for Deutsches Elektronen Synchrotron (DESY). A test diode with a 535-kV, 700-A electron beam was constructed to verify the gun operation. The first klystron was built and successfully met design specifications. The 375-MW electron beam represents a new record for SLAC accelerator klystrons in terms of voltage, current, energy, and ruggedness of design. The rf output power is a 150% increase over the S-band tubes currently used in the two-mile-long linear accelerator at SLAC. This paper discusses design issues and experimental results of the diode and klystron.

Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Energy Research, Washington, DC (United States)
DOE Contract Number:
AC03-76SF00515
OSTI ID:
489687
Report Number(s):
SLAC-PUB--6682; CONF-9410218--12; ON: DE97006494
Country of Publication:
United States
Language:
English

Similar Records

Performance of a 150-MW S-band Klystron
Journal Article · Wed Jul 05 00:00:00 EDT 1995 · AIP Conference Proceedings · OSTI ID:119401

The design and performance of 150-MW S-band klystrons
Conference · Thu Sep 01 00:00:00 EDT 1994 · OSTI ID:10190554

150-MW S-band klystron program at the Stanford Linear Accelerator Center
Conference · Mon Jul 01 00:00:00 EDT 1996 · OSTI ID:621803