Title: THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY

Technical Report ·
DOI:https://doi.org/10.2172/4843886· OSTI ID:4843886

The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth)

Research Organization:
Argonne National Lab., Ill.
DOE Contract Number:
W-31-109-ENG-38
NSA Number:
NSA-15-027065
OSTI ID:
4843886
Report Number(s):
ANL-6092
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-61
Country of Publication:
United States
Language:
English