Title: THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY

Abstract

The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth)

Authors:
;
Publication Date:
Research Org.:
Argonne National Lab., Ill.
OSTI Identifier:
4843886
Report Number(s):
ANL-6092
NSA Number:
NSA-15-027065
DOE Contract Number:  
W-31-109-ENG-38
Resource Type:
Technical Report
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-61
Country of Publication:
United States
Language:
English
Subject:
REACTOR TECHNOLOGY; BONDING; BREEDING; CASTING; CONTROL SYSTEMS; EBR-2; FABRICATION; FUEL ELEMENTS; GAS FLOW; GASES; LABORATORY EQUIPMENT; MAINTENANCE; MELTING; PERSONNEL; PLANNING; REACTOR CORE; REACTOR FUELING; REACTORS; REMOTE HANDLING; REPROCESSING; SEPARATION PROCESSES; TESTING

Citation Formats

Ayer, J. E., and Shuck, A. B. THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY. United States: N. p., 1961. Web. doi:10.2172/4843886.
Ayer, J. E., & Shuck, A. B. THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY. United States. https://doi.org/10.2172/4843886
Ayer, J. E., and Shuck, A. B. 1961. "THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY". United States. https://doi.org/10.2172/4843886. https://www.osti.gov/servlets/purl/4843886.
@article{osti_4843886,
title = {THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY},
author = {Ayer, J. E. and Shuck, A. B.},
abstractNote = {The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth)},
doi = {10.2172/4843886},
url = {https://www.osti.gov/biblio/4843886}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jun 01 00:00:00 EDT 1961},
month = {Thu Jun 01 00:00:00 EDT 1961}
}