Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

ADDENDUM TO D102A HAZARDS REPORT

Technical Report ·
OSTI ID:4820991
. Further evaluation of the assembly is presented with regard to the hazards involved in the continuation of Heat Transfer Reactor Experiment No. 3. This additional evaluation was made taking into consideration the condttions leading to the power excursion of November 18, 1958. Operation of the rebuilt core is scheduled to start in July of 1959. The reactor is essentially the same as was tested up to November 1958. The fuel is completely replaced with fuel cartridges of the same design. Most of the moderator assemblies were salvaged. However, all moderator assemblies were modified slightly to correct an interference condition. The control rod guide tubes also required partial replacement. Limitations in operating procedure are more explicitly defined. These, and the modifications in design, are described in detail. Further information concerning the probability and seriousness of reactor accidents is also included. (auth)
Research Organization:
General Electric Co. Aircraft Nuclear Propulsion Dept., Cincinnati
DOE Contract Number:
AT(11-1)-171
NSA Number:
NSA-16-006094
OSTI ID:
4820991
Report Number(s):
APEX-482
Country of Publication:
United States
Language:
English

Similar Records

D102A DATA BOOK, 8TH ISSUE
Technical Report · Wed Jul 29 00:00:00 EDT 1959 · OSTI ID:4800699

HTRE HAZARDS REPORT
Technical Report · Tue Dec 14 23:00:00 EST 1954 · OSTI ID:4805552

SMR SUMMARY HAZARDS REPORT
Technical Report · Wed Jun 15 00:00:00 EDT 1955 · OSTI ID:4805148