HTRE NO. 1 PROJECT 100 MAINTENANCE MANUAL-REACTOR ASSEMBLY AND AUXILIARY SYSTEMS
Technical Report
·
OSTI ID:4789977
A compilation is presented of information that may be required to maintain the HTRE-1 reactor assembly and auxiliary systems. Core and plug drain system, actuator cooling system, and general wiring and wiring harness are covered. (M.C.G.)
- Research Organization:
- General Electric Co. Aircraft Nuclear Propulsion Dept., Cincinnati
- DOE Contract Number:
- AT(11-1)-171
- NSA Number:
- NSA-16-017289
- OSTI ID:
- 4789977
- Report Number(s):
- DC-55-11-25
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRELIMINARY HTRE NO. 1 PROJECT 100 OPERATION MANUAL 21, REACTOR ASSEMBLY, CORE "A"
HTRE HAZARDS REPORT
RESULTS OF COLD FLOW PERFORMANCE TESTS ON A 1/4-SCALE HTRE 3 REACTOR-SHIELD MOCKUP
Technical Report
·
Wed Sep 28 00:00:00 EDT 1955
·
OSTI ID:4813340
HTRE HAZARDS REPORT
Technical Report
·
Tue Dec 14 23:00:00 EST 1954
·
OSTI ID:4805552
RESULTS OF COLD FLOW PERFORMANCE TESTS ON A 1/4-SCALE HTRE 3 REACTOR-SHIELD MOCKUP
Technical Report
·
Mon Apr 18 23:00:00 EST 1960
·
OSTI ID:4808426