Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PREPARING EBWR FOR HIGH POWER OPERATION

Technical Report ·
OSTI ID:4756649
Modifications to the EBWR for operation at 100 Mw(t) are described. Preparntions before shutting down the reactor, unloading the reactor, opening the piping tunnel, reactor vessel modifications, modifications within the existing facility, and new additions are discussed. A general description of the systems is included. (M.C.G.)
Research Organization:
Argonne National Lab., Ill.
DOE Contract Number:
W-31109-ENG-38
NSA Number:
NSA-17-007612
OSTI ID:
4756649
Report Number(s):
TID-14697; UAC-5783
Country of Publication:
United States
Language:
English