PREPARING EBWR FOR HIGH POWER OPERATION
Technical Report
·
OSTI ID:4756649
Modifications to the EBWR for operation at 100 Mw(t) are described. Preparntions before shutting down the reactor, unloading the reactor, opening the piping tunnel, reactor vessel modifications, modifications within the existing facility, and new additions are discussed. A general description of the systems is included. (M.C.G.)
- Research Organization:
- Argonne National Lab., Ill.
- DOE Contract Number:
- W-31109-ENG-38
- NSA Number:
- NSA-17-007612
- OSTI ID:
- 4756649
- Report Number(s):
- TID-14697; UAC-5783
- Country of Publication:
- United States
- Language:
- English
Similar Records
HAZARDS EVALUATION REPORT ASSOCIATED WITH THE OPERATION OF EBWR AT 100 MW
MODIFICATION OF THE EXPERIMENTAL BOILING WATER REACTOR (EBWR) FOR HIGHER- POWER OPERATION
HAZARDS EVALUATION REPORT ASSOCIATED WITH THE OPERATION OF EBWR AT 100 MW
Technical Report
·
Sat Oct 01 00:00:00 EDT 1960
·
OSTI ID:4793744
MODIFICATION OF THE EXPERIMENTAL BOILING WATER REACTOR (EBWR) FOR HIGHER- POWER OPERATION
Technical Report
·
Sat Mar 31 23:00:00 EST 1962
·
OSTI ID:4828653
HAZARDS EVALUATION REPORT ASSOCIATED WITH THE OPERATION OF EBWR AT 100 MW
Technical Report
·
Mon Nov 30 23:00:00 EST 1959
·
OSTI ID:4170742
Related Subjects
BOILING
BURNOUT
CONFIGURATION
COOLANT LOOPS
COOLING
EBWR
EFFICIENCY
FUEL ELEMENTS
HEAT TRANSFER
HIGH TEMPERATURE
MAINTENANCE
NEUTRON FLUX
PIPES
PLANNING
POWER PLANTS
PRESSURE
PRESSURE VESSELS
REACTOR CORE
REACTOR FUELING
REACTOR SAFETY
REACTOR TECHNOLOGY
REACTORS
SHUTDOWN
SURFACES
TEMPERATURE
VESSELS
WATER COOLANT
BURNOUT
CONFIGURATION
COOLANT LOOPS
COOLING
EBWR
EFFICIENCY
FUEL ELEMENTS
HEAT TRANSFER
HIGH TEMPERATURE
MAINTENANCE
NEUTRON FLUX
PIPES
PLANNING
POWER PLANTS
PRESSURE
PRESSURE VESSELS
REACTOR CORE
REACTOR FUELING
REACTOR SAFETY
REACTOR TECHNOLOGY
REACTORS
SHUTDOWN
SURFACES
TEMPERATURE
VESSELS
WATER COOLANT