PL-2 COST REPORT

Technical Report ·
OSTI ID:4728225

A cost estimate was made for the PL-2 reactor plant installed at a site such as an antarctic snow tunnel. A manpower estimate for erection of the PL-2 plant at a prepared snow tunnel site is included. (J.R.D.)

Research Organization:
Combustion Engineering, Inc., Windsor, Conn.
NSA Number:
NSA-17-015447
OSTI ID:
4728225
Report Number(s):
CEND-154
Country of Publication:
United States
Language:
English