PL-2 COST REPORT
Technical Report
·
OSTI ID:4728225
A cost estimate was made for the PL-2 reactor plant installed at a site such as an antarctic snow tunnel. A manpower estimate for erection of the PL-2 plant at a prepared snow tunnel site is included. (J.R.D.)
- Research Organization:
- Combustion Engineering, Inc., Windsor, Conn.
- NSA Number:
- NSA-17-015447
- OSTI ID:
- 4728225
- Report Number(s):
- CEND-154
- Country of Publication:
- United States
- Language:
- English