RADIOISOTOPE FUELED AUXILIARY POWER UNIT. PIED PIPER APU. Quarterly Progress Report No. 3, July 1, 1957-October 1, 1957
Technical Report
·
OSTI ID:4684094
Progress made in the development of SNAP-1 is reported. Drawings of the shielding and remote handling equipment are given. The hazards of this power plant are summarized. The conceptual design of the boiler is revised. The CeO/ sub 2/ fuel capsules will be mounted in a block of molybdenum by drilling longitudinal holes and inserting. The thermal bond material between the molybdenum block and the mercury bearing coil will be molten lead. Results of studies on fabrication of CeO/sub 2/ cermets are given. Equipment for static corrosion testing with mercury,and lead is diagramed. development work on the power conversion system is discussed. (N.W.R.)
- Research Organization:
- Martin Co., Baltimore Page(s): 51
- DOE Contract Number:
- AT(30-3)-217
- NSA Number:
- NSA-17-031760
- OSTI ID:
- 4684094
- Report Number(s):
- MND-P-1175
- Country of Publication:
- United States
- Language:
- English
Similar Records
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 6, April 1958-July 1958
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 4, October 1957-January 1958
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 5, January-April 1958
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4667334
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 4, October 1957-January 1958
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4675397
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 5, January-April 1958
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4684058