RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 4, October 1957-January 1958
Work was directed toward building a suitable mercury heat transfer loop that can be operated with a full-size boiler mockup under environmental conditions of both launch and outer space. A new half-power boiler mockup was designed to replace the full-size boiler in the heat transfer test loop. Fuel assembly studies were made on the stabilization of CeO/sub 2/ and the oxidation of molybdenum. Corrosion test results on stainless steels, chromium steels, and nickel alloys in contrast with liquid lead, mercury vapor, and liquid mercury are presented. The test rig checkouts were essentially completed and testing was initiated in every area of the power conversion system program. All component groups were directed toward obtaining experimental verification of the individual component designs established for the turbine-alternator dynamometer. (N.W.R.)
- Research Organization:
- Martin Co., Baltimore Page(s): 73
- DOE Contract Number:
- AT(30-3)-217
- NSA Number:
- NSA-17-031761
- OSTI ID:
- 4675397
- Report Number(s):
- MND-P-3001
- Country of Publication:
- United States
- Language:
- English
Similar Records
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 5, January-April 1958
RADIOISOTOPE FUELED AUXILIARY POWER UNIT. PIED PIPER APU. Quarterly Progress Report No. 3, July 1, 1957-October 1, 1957
Related Subjects
CERIUM OXIDES
CHROMIUM STEELS
CONVERSION
CORROSION
DYNAMOMETERS
GENERATORS
HEAT EXCHANGERS
HEAT TRANSFER
INSTRUMENTS
LIQUID METALS
MATERIALS TESTING
MEASURED VALUES
MECHANICS
MERCURY
MOCKUP
MOLYBDENUM
MOMENTUM
NICKEL ALLOYS
OXIDATION
PLANNING
POWER
SPACE APPLICATIONS AND TECHNOLOGY
SPACE VEHICLES
STABILITY
STAINLESS STEELS
TUBES
TURBINES
VAPORS