O.E.C.D. HIGH TEMPERATURE REACTOR PROJECT DRAGON. FOURTH ANNUAL REPORT, APRIL 1, 1962-MARCH 31, 1963
Technical Report
·
OSTI ID:4620068
A survey is presented of the work carried out from April 1, 1962 to March 31, 1963. Design work and civil construction were virtually completed in this period, and the dummy core was installed. The survey is divided into sections entitled research and development, reactor design and construction, assessment work, and administration. (D.L.C.)
- Research Organization:
- European Nuclear Energy Agency, Paris
- NSA Number:
- NSA-17-040344
- OSTI ID:
- 4620068
- Report Number(s):
- NP-13123
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
O.E.C.D. DRAGON HIGH TEMPERATURE REACTOR PROJECT FOURTH ANNUAL REPORT 1962- 1963
ACTIVITIES IN THE DIVISION OF HEALTH PHYSICS IN JAERI. Period Covered: April 1962-March 1963
INDEX FOR SOME DEVELOPMENTS IN ENGINEERING, FABRICATION, AND FIELD SUPPORT OF LABORATORY PROGRAMS. Reports I, II, and III, April 1962-September 1963
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4649519
ACTIVITIES IN THE DIVISION OF HEALTH PHYSICS IN JAERI. Period Covered: April 1962-March 1963
Technical Report
·
Fri Oct 30 23:00:00 EST 1964
·
OSTI ID:4067334
INDEX FOR SOME DEVELOPMENTS IN ENGINEERING, FABRICATION, AND FIELD SUPPORT OF LABORATORY PROGRAMS. Reports I, II, and III, April 1962-September 1963
Technical Report
·
Sat Feb 29 23:00:00 EST 1964
·
OSTI ID:4001933