PACKAGE POWER REACTOR NO. 1 STEAM CYCLE CALCULATIONS

Technical Report ·
OSTI ID:4353827

A study was made to determine the best steam cycle arrangement and reactor power requirement for a package power reactor system to supply a remote army station requiring 1OOO kw of electricity and 250 boiler horsepower (7.55 x 10/sup 6/ Btu/hr) of steam heating load. It was assumed that gross electric power requirement would be 1300 kw of electricity. (auth)

Research Organization:
Oak Ridge National Lab., Tenn.
DOE Contract Number:
W-7405-ENG-26
NSA Number:
NSA-12-007463
OSTI ID:
4353827
Report Number(s):
CF-53-3-213
Country of Publication:
United States
Language:
English

Similar Records

Design Analysis of a Prepackaged Nuclear Power Plant (1000 eKW). Volume II. Reactor Design Analysis
Technical Report · Sat Jan 31 23:00:00 EST 1959 · OSTI ID:1129041

DESIGN ANALYSIS OF A PREPACKAGED NUCLEAR POWER PLANT (1000 eKW). VOLUME I. PRIMARY AND SECONDARY SYSTEM DESIGN
Technical Report · Sat Jan 31 23:00:00 EST 1959 · OSTI ID:4177874

Retrofit utility power plant to combined cycle operation
Conference · Thu Dec 31 23:00:00 EST 1987 · Proceedings of the American Power Conference; (USA) · OSTI ID:7229209