Fuel cycles, fuel failures, and the mini-outage
Book
·
OSTI ID:4351199
From international nuclear industries fair; Basel, Switzerland (16 Oct 1972). For light water reactors, very fast refueling can reduce the effect of failed fuel on operator exposure and release of fission products to the environment by quickly detecting and removing fuiled fuel. Equipment and procedures are being developed that make possible a refueling outage in about five days for an 1100 MW(e) BWR. (auth)
- Research Organization:
- Originating Research Org. not identified
- NSA Number:
- NSA-29-025971
- OSTI ID:
- 4351199
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
Five years of operation of the Gundremmingen Nuclear Power Plant
Review of available fast reactor fuelling methods and a proposal for a refuelling scheme for large commercial fast reactors
ASEA--ATOM BWR: fuel design, fabrication, and performance
Book
·
Fri Dec 31 23:00:00 EST 1971
·
OSTI ID:4351113
Review of available fast reactor fuelling methods and a proposal for a refuelling scheme for large commercial fast reactors
Book
·
Fri Dec 31 23:00:00 EST 1971
·
OSTI ID:4324353
ASEA--ATOM BWR: fuel design, fabrication, and performance
Book
·
Fri Dec 31 23:00:00 EST 1971
·
OSTI ID:4333290
Related Subjects
*BWR TYPE REACTORS-- REACTOR FUELING
*FUEL CYCLE
*PWR TYPE REACTORS-- REACTOR FUELING
*REACTOR CHARGING MACHINES
*REACTOR FUELING
FAILURES
FUEL ELEMENTS
N77100* --Reactors--Power Reactors
Non-breeding
Light- water Moderated
Boiling Water-cooled
N77200 --Reactors--Power Reactors
Non-breeding
Light-water Moderated
Non-boiling Water-cooled
REACTOR MAINTENANCE
REACTOR OPERATION
*FUEL CYCLE
*PWR TYPE REACTORS-- REACTOR FUELING
*REACTOR CHARGING MACHINES
*REACTOR FUELING
FAILURES
FUEL ELEMENTS
N77100* --Reactors--Power Reactors
Non-breeding
Light- water Moderated
Boiling Water-cooled
N77200 --Reactors--Power Reactors
Non-breeding
Light-water Moderated
Non-boiling Water-cooled
REACTOR MAINTENANCE
REACTOR OPERATION