Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Experience with the AEP 765-kV system. II. System performance

Journal Article · · IEEE (Inst. Elec. Electron. Eng.), Trans. Power App. Syst., v. PAS- 92, no. 4, pp. 1337-1347
OSTI ID:4341204
The system performance aspects of AEP's experience with its 765-kV transmission network are discussed. The first segment of this network was energized in May 1969. Since that time, a total of 670 miles of 765-kV transmission has been placed in operation. The experiences accumulated thus far with bringing segments of 765-kV transmission into service, as well as with real and reactive power flow, reactive compensation and supply, voltage control, and 765-kV equipment spare requirements are reviewed. (auth)
Research Organization:
American Electric Power Service Corp., New York
NSA Number:
NSA-29-026442
OSTI ID:
4341204
Journal Information:
IEEE (Inst. Elec. Electron. Eng.), Trans. Power App. Syst., v. PAS- 92, no. 4, pp. 1337-1347, Journal Name: IEEE (Inst. Elec. Electron. Eng.), Trans. Power App. Syst., v. PAS- 92, no. 4, pp. 1337-1347; ISSN IEPSA
Country of Publication:
Country unknown/Code not available
Language:
English

Similar Records

Application of single-phase switching on the AEP 765-kV system
Conference · Mon Dec 31 23:00:00 EST 1979 · Proc. Am. Power Conf.; (United States) · OSTI ID:5448878

765 kV studies initiated on new network analyzer
Journal Article · Mon Sep 12 00:00:00 EDT 1966 · Electr. World; (United States) · OSTI ID:5716902

765 kV grid will be superimposed on existing AEP transmission system
Journal Article · Wed Jun 01 00:00:00 EDT 1966 · Power Eng.; (United States) · OSTI ID:7065739