Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

CONTROL OF GASES IN PRIMARY COOLANT DURING FILLING AND COLD PLANT STARTUP

Technical Report ·
OSTI ID:4323978
Estimates are presented of the amounts of gases which will be trapped in the S3G/S4G reactor plant for several cond(tions of cold plant startup. Gencral procedures to be followed during plant filling and warmup to reduce the amounts of gases remaining in the plant after startup are outlined. Specific control measures for each of the several modes of cold plant startup are given. (W.L.H.)
Research Organization:
Knolls Atomic Power Lab., Schenectady, N.Y.
DOE Contract Number:
W-31-109-ENG-52
NSA Number:
NSA-12-002510
OSTI ID:
4323978
Report Number(s):
KAPL-M-SMS-31
Country of Publication:
United States
Language:
English

Similar Records

A PRELIMINARY ANALYSIS OF THE THERMAL STATES AND THERMAL STRESSES IN THE S3G/S4G PRIMARY COOLANT SYSTEM PRESSURIZER DURING COLD-START-UP
Technical Report · Tue Apr 24 23:00:00 EST 1956 · OSTI ID:4322692

A SIMPLE MEANS OF DETECTING RADIOACTIVE GASES IN THE SHIP'S ATMOSPHERE
Technical Report · Wed Feb 25 23:00:00 EST 1959 · OSTI ID:4287667

DOSE RATES ON THE S3G/S4G BOILER AND PRIMARY COOLANT PIPING AFTER SHUTDOWN
Technical Report · Mon Feb 17 23:00:00 EST 1958 · OSTI ID:4310487