Preliminary design of the 2 MWt reactor and shield (PWAR-20) for the SNAP- 50/SPUR powerplant
Technical Report
·
OSTI ID:4315622
Declassified 6 Sep 1973. The SNAP-50/SPUR powerplant development program concentrates on a system designed for unattended operation in space for 10,000 hours, and which produces a net electrical output of 300 kW(e). The reactor and shield for this powerplant has been designated the PWAR-20. The powerplant weight goal for the 2-MW(t) reactor is l800 pounds, exclusive of shielding. A target weight for shielding, the design of which is mission oriented, has not been specified because mission requirements have not been clarified to date. The preliminary design of the PWAR-20 is presented. The major problem areas which exist are described. 25 references. (auth)
- Research Organization:
- Pratt and Whitney Aircraft, Middletown, Conn. (USA). Connecticut Advanced Nuclear Engineering Lab.
- DOE Contract Number:
- AT(30-1)-2789
- NSA Number:
- NSA-29-031317
- OSTI ID:
- 4315622
- Report Number(s):
- PWAC-445
- Resource Relation:
- Other Information: Declassified 6 Sep 1973. Orig. Receipt Date: 30-JUN-74
- Country of Publication:
- United States
- Language:
- English
Similar Records
Summary of design studies leading to preliminary design of 2-MWt reactor and shield (PWAR-20)
PWAR-20 reactor (2-MWt) preliminary design engineering analysis
SNAP-50/SPUR first flight powerplant: preliminary design specifications
Technical Report
·
Tue Dec 01 00:00:00 EST 1964
·
OSTI ID:4315622
PWAR-20 reactor (2-MWt) preliminary design engineering analysis
Technical Report
·
Tue Dec 01 00:00:00 EST 1964
·
OSTI ID:4315622
SNAP-50/SPUR first flight powerplant: preliminary design specifications
Technical Report
·
Fri Jun 21 00:00:00 EDT 1963
·
OSTI ID:4315622