BEVATRON OPERATION AND DEVELOPMENT. XVII. Period Covered : February, March, April 1958
Beam evaluation was completed preparatory to a K/sup +/p/sup +/ scattering experiment. The K+ meson beam was also used to expose sixteen emulsion stacks for eight outside groups. The study of K- mesons continued, using the liquid hydrogen bubble chamber and emulsions. Antiproton interactions were observed by using counters, the propane bubble chamber, and nuclear emulsions; p-p(-) interactions were also observed in the hydrogen bubble chamber. Three target bombardments were made for the laboratory chemistry group and sixteen borabardments made for external groups. The rapid beam ejector was successfully operated and has been used to produce short beam pulses, 20 microseconds in duration, for bubble chamber runs. On April 23, 1950, Bevatron operation was suspended when a bolt was sheared off the armature of the east generator, resulting in abrasion and fire damage to one-third of the stator windings and in electrical arc damage to a bearing and journal. Operation is scheduled to resume on May 26, 1958, with one generator, after an inspection has been made of the east machine. The damaged generator is expected to be operable about the end of July. (For preceding period see UCRL-8261.) (auth)
- Research Organization:
- California Univ., Berkeley, CA (US). Radiation Lab.
- DOE Contract Number:
- W-7405-ENG-48
- NSA Number:
- NSA-13-001437
- OSTI ID:
- 4301381
- Report Number(s):
- UCRL-8334
- Country of Publication:
- United States
- Language:
- English
Similar Records
BEVATRON OPERATION AND DEVELOPMENT. XX. Period covered November, December 1958, January 1959
BEVATRON OPERATION AND DEVELOPMENT. XVI. Period Covered November, December 1957, January 1958
BEVATRON OPERATION AND DEVELOPMENT. XXV. Period covered February, March, April 1960
Technical Report
·
Tue Sep 01 00:00:00 EDT 1959
·
OSTI ID:4215589
BEVATRON OPERATION AND DEVELOPMENT. XVI. Period Covered November, December 1957, January 1958
Technical Report
·
Mon May 26 00:00:00 EDT 1958
·
OSTI ID:4332806
BEVATRON OPERATION AND DEVELOPMENT. XXV. Period covered February, March, April 1960
Technical Report
·
Wed Jun 01 00:00:00 EDT 1960
·
OSTI ID:4156653
Related Subjects
ANTIPROTONS-- BEVATRON-- BUBBLE CHAMBERS-- COUNTERS-- HYDROCARBONS-- HYDROGEN-- INTERACTIONS-- LIQUIDS-- MEASURED VALUES-- NUCLEAR EMULSIONS-- OPERATION-- PROTON BEAMS-- PROTONS-- SYNCHROTRONS
BEAM OPTICS-- BEAMS-- BEVATRON-- BUBBLE CHAMBERS-- CIRCUITS-- DEFORMATION-- OPERATION-- PRODUCTION-- PROTON BEAMS-- PROTONS-- PULSES-- SYNCHROTRONS
BEAMS-- BEVATRON-- BUBBLE CHAMBERS-- HYDROGEN-- KAONS-- LIQUIDS-- MEASURED VALUES-- NUCLEAR EMULSIONS-- OPERATION-- PROTON BEAMS-- PROTONS-- SCATTERING-- SYNCHROTRONS
BEVATRON-- ELECTRIC ARCS-- FAILURES-- FIRE-- GENERATORS-- OPERATION-- PROTON BEAMS-- PROTONS-- SYNCHROTRONS
BEVATRON-- IRRADIATION-- OPERA
PARTICLE ACCELERATORS AND HIGH-VOLTAGE MACHINES
BEAM OPTICS-- BEAMS-- BEVATRON-- BUBBLE CHAMBERS-- CIRCUITS-- DEFORMATION-- OPERATION-- PRODUCTION-- PROTON BEAMS-- PROTONS-- PULSES-- SYNCHROTRONS
BEAMS-- BEVATRON-- BUBBLE CHAMBERS-- HYDROGEN-- KAONS-- LIQUIDS-- MEASURED VALUES-- NUCLEAR EMULSIONS-- OPERATION-- PROTON BEAMS-- PROTONS-- SCATTERING-- SYNCHROTRONS
BEVATRON-- ELECTRIC ARCS-- FAILURES-- FIRE-- GENERATORS-- OPERATION-- PROTON BEAMS-- PROTONS-- SYNCHROTRONS
BEVATRON-- IRRADIATION-- OPERA
PARTICLE ACCELERATORS AND HIGH-VOLTAGE MACHINES