Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

DIVISION OF REACTOR DEVELOPMENT PROGRAMS MONTHLY REPORT FOR DECEMBER 1958

Technical Report ·
OSTI ID:4294972

In the Plutonium Recycle Program, brief reports of preparation of sample fuel materials for irradiation testing are given. Design of Al--Pu clusters for ETR irradiation testing is discussed. Data on sintering of UO/sub 2/--PuO/sub 2/ mixtures are given. Studies are also reponted on: injection casting; extrusion of Al--U; welding Zircaloy-2 tubing; gross melting of unsintered U0/sub 2/ in Zircaloy-2 tubes; coolant systems development; thermal hydraulics; mechanical equipment development; design development; pyrochemical processing of PRP fuels; PRTR fuels processing; computer programming operation; Gas Cooled Central Power Station Reactor; Army Gas-Cooled Reactor; and nondestructive fuel testing. (For preceding peried see HW-58555.) (T.H.H.)

Research Organization:
General Electric Co. Hanford Atomic Products Operation, Richland, Wash
DOE Contract Number:
W-31-109-ENG-52
NSA Number:
NSA-13-005907
OSTI ID:
4294972
Report Number(s):
HW-58860
Country of Publication:
United States
Language:
English