Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The N4 1450-MW(electric) series: The new generation of French PWRs

Journal Article · · Transactions of the American Nuclear Society
OSTI ID:426283
 [1]
  1. Electricite de France, Paris (France)

The French nuclear power plant program was launched in 1970 and subsequently stepped up in 1974. Today, 75% of the electricity produced in France is generated by nuclear power plants. The pressurized water reactor (PWR) series operating in France are the following (years of connection to the grid are included in parentheses): (1) 900 MW(electric) a. CP0: 6 units (1977-1979) b. CP1: 18 units (1980-1985) c. CP2: 10 units (1981-1987) (2) 1300 MW(electric) a. P4: 8 units (1984-1988) b. P4: 12 units (1988-1993). Electricite de France (EdF) is now commissioning the N4, a new series of 1450-MW (electric) plants of entirely French design. This series includes four units: two on the site of CHOOZ and two on the site of CIVAUX.

OSTI ID:
426283
Report Number(s):
CONF-961103--
Journal Information:
Transactions of the American Nuclear Society, Journal Name: Transactions of the American Nuclear Society Vol. 75; ISSN TANSAO; ISSN 0003-018X
Country of Publication:
United States
Language:
English

Similar Records

Assessment of uncertainties for PWR pressure vessel surveillance-French Experience
Journal Article · Mon Dec 30 23:00:00 EST 1996 · Transactions of the American Nuclear Society · OSTI ID:436885

The French nuclear power plant reactor building containment contributions of prestressing and concrete performances in reliability improvements and cost savings
Conference · Wed Dec 30 23:00:00 EST 1998 · OSTI ID:318984

Plant standardization: the French experience
Conference · Tue Dec 31 23:00:00 EST 1985 · Trans. Am. Nucl. Soc.; (United States) · OSTI ID:6582778