Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

INSPECTION AND MAINTENANCE OF LARGE REACTORS AT WINDSCALE WORKS AND CALDER HALL

Technical Report ·
OSTI ID:4262412
An account is given of the maintenance and remedial work which has been done within the biological shield of the Windscale reactors, and covers: (a) Retention of reactor fuel elements which were tending to blow out of the graphite channels. (b) Remote welding and cutting operations using oxy-acetylene equipment at distances of up to 20 feet from the operating position. (c) Repair work on the fuel element detection gear which involved the entry of personnel into the biological shield. Details are given of the health physics control and of radiation exposures received by personnel during the maintenance of the fuel element detection gear. No maintenance work has been necessary within the biological shields on Calder Hall Reactors, but both heat exchangers and gas inlet ducts have been entered for inspection. The result of such inspections and health physics data are given. (auth)
Research Organization:
United Kingdom Atomic Energy Authority, Risley, Lancs, Eng.
NSA Number:
NSA-13-007260
OSTI ID:
4262412
Report Number(s):
A/CONF.15/P/1518
Country of Publication:
Country unknown/Code not available
Language:
English