HIGH ENERGY RATE METAL FORMING. Interim Engineering Report No. 3 for October 1 to December 31, 1958
Technical Report
·
OSTI ID:4252009
An evaluation of the results of employing high explosives of different weights and at differcnt standoff distances to the iorming of hemispherical cups in air is given together with soine metallurgical data on the effect of high- energy rates on annealed Vascojet-1000 alloy steel sheet. An outline of the work planned during the next quarter is also presented. (auth)
- Research Organization:
- Lockheed Aircraft Corp., Burbank, Calif.
- NSA Number:
- NSA-13-013528
- OSTI ID:
- 4252009
- Report Number(s):
- LR-13435
- Country of Publication:
- United States
- Language:
- English
Similar Records
HIGH ENERGY RATE METAL FORMING. Interim Engineering Report No. 4 for January 1 to March 31, 1959
HIGH ENERGY RATE METAL FORMING. Interim Engineering Report No. 2 for July 1 to September 30, 1958
HIGH ENERGY RATE METAL FORMING INTERIM TECHNICAL ENGINEERING REPORT NO. 6, REPORTING PERIOD JULY 1 TO SEPTEMBER 30, 1959
Technical Report
·
Fri Oct 30 23:00:00 EST 1959
·
OSTI ID:4246195
HIGH ENERGY RATE METAL FORMING. Interim Engineering Report No. 2 for July 1 to September 30, 1958
Technical Report
·
Fri Oct 30 23:00:00 EST 1959
·
OSTI ID:4252010
HIGH ENERGY RATE METAL FORMING INTERIM TECHNICAL ENGINEERING REPORT NO. 6, REPORTING PERIOD JULY 1 TO SEPTEMBER 30, 1959
Technical Report
·
Sun Oct 30 23:00:00 EST 1960
·
OSTI ID:4235989