Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

HIGH ENERGY RATE METAL FORMING INTERIM TECHNICAL ENGINEERING REPORT NO. 6, REPORTING PERIOD JULY 1 TO SEPTEMBER 30, 1959

Technical Report ·
OSTI ID:4235989
Design parameters associated with the explosive forming process were investigated. An investigation is also being conducted to determine if the metallurgical properties of materials are affected in explosion forming. (W.J.H.)
Research Organization:
Lockheed Aircraft Corp., Burbank, Calif.
NSA Number:
NSA-14-001818
OSTI ID:
4235989
Report Number(s):
LR-14059
Country of Publication:
United States
Language:
English