Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Operational strategies for dispatchable combined cycle plants, Part I

Journal Article · · Turbomachinery International
OSTI ID:420888
;  [1]
  1. Brush Cogeneration Facility, Brush, CO (United States)
The Brush Cogeneration Facility is a dual-unit, combined cycle, cogeneration plant operating in a daily cycling, automatically-dispatchable mode. According to the PSCO tariff for cogenerators, the Independent Power Production Facility Policy, the highest payment schedule is reserved for those facilities capable of automatic generation control (AGC), the so-called `Category 4A Facilities.` AGC entails the ability to receive microwave signals from PSCO`s Load Control Center at Lookout Mountain, Colorado, and automatically adjust output at a rate of 2% of contract maximum load per minute, over at least the top 40% of contract load range. Perhaps the most critical equipment modification enabling AGC was the re-enabling of automatic variable inlet guide vane (IGV) control. During control system modifications for automatic IGVs, the operators realized that the Woodward NetCon control system`s capabilities of control, monitoring and information display were better than anticipated. The relative ease with which IGV changes were made encouraged the operating team to continue to maximize efficiency and optimize plant operations. In fact, the ease of use and modification led to the purchase of an additional NetCon system for plant-wide performance monitoring. The retrofit of the gas turbine control system with the NetCon system was a success. 1 tab.
OSTI ID:
420888
Journal Information:
Turbomachinery International, Journal Name: Turbomachinery International Journal Issue: 4 Vol. 37; ISSN 0149-4147; ISSN TUINDP
Country of Publication:
United States
Language:
English