Lamarliquido plant modernization
Conference
·
OSTI ID:418189
- Maraven S.A., Maracaibo (Venezuela)
After more than 25 years of operation with its original pneumatic instrumentation, the offshore 7,500 b/d capacity Lamarliquido LPG plant was submitted to a modernization project, in order to innovate the whole plant control systems. This paper describes the phases of the project which includes the installation and integration of the following four control systems: distributed control system; fire prevention detection and control system; refrigeration process turbocompressor control system; and emergency shut down system. Details about the different functions developed by each one of the systems are given, emphasizing the logic of operation, main equipment involved and reasons for applications. After a successful completion of the modernization project, the plant is operating fully remote from a new central control room with a maximum production of 5,500 b/d and an expected one of 6,600 b/d.
- OSTI ID:
- 418189
- Report Number(s):
- CONF-960348--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Venezuelan plant completes instrument upgrade
Pneumatic crude-unit controls modernized
New method developed for LPG offshore loading
Journal Article
·
Mon Jul 22 00:00:00 EDT 1996
· Oil and Gas Journal
·
OSTI ID:260677
Pneumatic crude-unit controls modernized
Journal Article
·
Sun Apr 20 23:00:00 EST 1986
· Oil Gas J.; (United States)
·
OSTI ID:5716029
New method developed for LPG offshore loading
Journal Article
·
Tue Oct 01 00:00:00 EDT 1985
· Pipeline Gas J.; (United States)
·
OSTI ID:6217055