Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

DRIFT TUBE ALIGNMENT FOR THE AGS LINAC

Technical Report ·
OSTI ID:4177806
All drift tubes were positioned horizontally and vertically within plus or minus 0.015 inch prior to the axial alignment. The techniques for horizontal and vertical positioning are summarized. In the final method for locating drift tubes axally, the low energy end of each tank was selected as a reference point and dimensions were established to the high energy end of each drift tube in the tank. (W.D.M.)
Research Organization:
Brookhaven National Lab., Upton, N.Y.
NSA Number:
NSA-14-011163
OSTI ID:
4177806
Report Number(s):
BNL-4689; ADD-AK-1
Country of Publication:
Country unknown/Code not available
Language:
English

Similar Records

ALIGNMENT OF AGS LINEAR ACCELERATOR TANK
Technical Report · Tue May 12 00:00:00 EDT 1959 · OSTI ID:4177810

70-MeV injector alignment proposals. Part 1 tank and drift tube alignment
Technical Report · Sat Sep 01 00:00:00 EDT 1973 · OSTI ID:4934158

LINEAR ACCELERATOR DRIFT TUBE SUPPORT
Technical Report · Mon Feb 27 23:00:00 EST 1956 · OSTI ID:4183183