POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period November 1, 1959 through November 30, 1959
Technical Report
·
OSTI ID:4163714
Four Vallecitos prototype tubes of unalloyed U were extruded. Two full- size tubes with cores of U-1 wt.% Si and U-1.5 wt.% Mo, respectively, are being processed for irradiation testing to permit comparison of swelling behavior with that of U-2 wt.% Zr. The work on two Al alloys, U-0.2 wt.% Al and U-0.5 wt.% Al, is concentrating on suitable methods for grain refinement. Work on metastable beta-phase U alloy has progressed through the stage of extrusion and evaluation of rods of four promising compositions. Several 4-inch-diameter tubular stainless steelZircaloy joints were extruded. (For preceding period see NMI- 7221.). (W.L.H.)
- Research Organization:
- Nuclear Metals, Inc., Concord, Mass.
- NSA Number:
- NSA-14-023217
- OSTI ID:
- 4163714
- Report Number(s):
- NMI-7222
- Country of Publication:
- United States
- Language:
- English
Similar Records
POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period October 1, 1959 through October 31, 1959
POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period July 1, 1959 through July 31, 1959
POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period December 1, 1959 through December 31, 1959
Technical Report
·
Thu Mar 17 23:00:00 EST 1960
·
OSTI ID:4152185
POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period July 1, 1959 through July 31, 1959
Technical Report
·
Wed Oct 21 00:00:00 EDT 1959
·
OSTI ID:4218539
POWER REACTOR PROGRAM. Progress Report to E.I. du Pont de Nemours and Company for the Period December 1, 1959 through December 31, 1959
Technical Report
·
Fri Jun 24 00:00:00 EDT 1960
·
OSTI ID:4150281