Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

HAZARDS SUMMARY REPORT--PREPACKAGED NUCLEAR POWER PLANT FOR AN ICE CAP LOCATION (PM-2A)

Technical Report ·
DOI:https://doi.org/10.2172/4159680· OSTI ID:4159680
As a consequence of several design changes in the PM2A after the preparation of the original Hazards Summary Report, amendments to this report are required to reflect these changes. These amendments are presented. In response to questions from the Danish Government, on whose land this reactor will be built, an addendum was prepared containing additional information which was not in the original Hazards Sammary Report. There is no change in the conclusions of the original report. There will be no hazard to personnel when the Nuclear Power Plant is operating under normal conditions, and there is no major hazard to personnel should the maximum credible accident occur. (auth)
Research Organization:
ALCO Products, Inc., Schenectady, N.Y.
NSA Number:
NSA-14-023736
OSTI ID:
4159680
Report Number(s):
APAE-49(Suppl.1)
Country of Publication:
United States
Language:
English