NUCLEAR SUPERHEAT PROJECT. Sixteenth Quarterly Report, May-July 1963

Technical Report ·
OSTI ID:4151316

The ESH-1.1 fuel assembly was replaced in VDWR for continued irradiation. Design and development work is proceeding on EVESR prototype elements to be installed in ESH-3. Material specifications for nuclear quality Inconel 600, Incoloy 800, and 300 series stainless steel were formulated and issued. The fabrication techniques and properties for Incoloy are described. Testing of cladding materials in the CL-1 and -4 loops is evaluated. The E-SADE condenser was replaced and loop operation resumed with ESH-1.1. Installation and checkout of the Mixed Spectrum Critical Assembly (MSCA) is approximately 80% complete. A test program is established for loading the core to the design power split which will extend over four months. Physics calculations of an MSSR core with and without a small amount of moderator indicate the degraded spectrum obtained with 1.8 vol% polyethylene results in an increase in Doppler coefficient by a factor of two. The large power spike at the outer endge of the fast core cand be reduced by increasing the fast buffer thickness with little change in the power split. (N.W.R.)

Research Organization:
General Electric Co. Atomic Power Equipment Dept., San Jose, Calif.
NSA Number:
NSA-18-001241
OSTI ID:
4151316
Report Number(s):
GEAP-4332
Country of Publication:
United States
Language:
English

Similar Records

NUCLEAR SUPERHEAT PROJECT FIFTEENTH QUARTERLY REPORT, JANUARY-MARCH 1963
Technical Report · Wed May 15 00:00:00 EDT 1963 · OSTI ID:4631597

NUCLEAR SUPERHEAT PROJECT TWELFTH QUARTERLY REPORT, APRIL-JUNE 1962
Technical Report · Wed Oct 30 23:00:00 EST 1963 · OSTI ID:4648073

NUCLEAR SUPERHEAT PROJECT THIRTEENTH QUARTERLY REPORT, JULY-SEPTEMBER 1962
Technical Report · Wed Oct 30 23:00:00 EST 1963 · OSTI ID:4660176