Pressurized Water Reactor Project. Technical progress report for the period January 26, 1975--July 25, 1975

Technical Report ·
OSTI ID:4134788
Shippingport PWR Core 2, Seed 2 has remained shutdown since February 4, 1974, following a failure of the main unit turbine generator. Defueling of PWR-2 continued with head area component disassembly, main omega seal weld cutting, and removal of the reactor vessel head. Plant conditions are being maintained to support the defueling operation. The 1A, 1C, and 1D loops are isolated from the reactor vessel and in a dry layup condition. The 1B loop is open to the reactor vessel. The 1B loop, reactor vessel, and pressurizer are in a partially drained condition. A nitrogen atmosphere is being maintained in the 1B loop. The reactor vessel water level is being maintained within a narrow control band. Routine periodic preventative maintenance work is in progress. The 1A Reactor Coolant Pump was removed, sent off-site for refurbishment, and reinstalled. The 1A heat exchanger was removed and a spare unit placed into its position. Work has begun to remove the 1D heat exchanger for replacement with another spare unit. (auth)
Research Organization:
Bettis Atomic Power Lab., West Mifflin, Pa. (USA)
NSA Number:
NSA-33-008685
OSTI ID:
4134788
Report Number(s):
WARD-MRP--144
Country of Publication:
United States
Language:
English