COSTS OF FABRICATING UO$sub 2$-PuO$sub 2$ SWAGE-COMPACTED FUEL ELEMENTS
Technical Report
·
OSTI ID:4127316
A detailed analysis is presented of the costs of fabricating UO/sub 2/- PuO/sub 2/ fuel elements for the Plutoium Recycle Program by the cold swage compaction process. The cost breakdown includes the Zircaloy components, loading and decontamination, plant capital costs, indirect costs, and nuclear materials. (D.L.C.)
- Research Organization:
- General Electric Co. Hanford Atomic Products Operation, Richland, Wash.
- DOE Contract Number:
- AT(45-1)-1350
- NSA Number:
- NSA-18-008766
- OSTI ID:
- 4127316
- Report Number(s):
- HW-SA-3132; CONF-187-33
- Country of Publication:
- United States
- Language:
- English
Similar Records
FABRICATION OF UO$sub 2$-PuO$sub 2$ SWAGE COMPACTED FUEL ELEMENTS
SPECIFICATIONS FOR SWAGE-COMPACTED, MIXED OXIDE (UO$sub 2$-PuO$sub 2$) FUEL ELEMENTS FOR THE PRTR(MARK I-M)
HEAD-WELDED SWAGEABLE END CAP FOR UO$sub 2$-PuO$sub 2$ FUEL ELEMENTS
Technical Report
·
Wed Oct 31 23:00:00 EST 1962
·
OSTI ID:4729133
SPECIFICATIONS FOR SWAGE-COMPACTED, MIXED OXIDE (UO$sub 2$-PuO$sub 2$) FUEL ELEMENTS FOR THE PRTR(MARK I-M)
Technical Report
·
Tue Oct 01 00:00:00 EDT 1963
·
OSTI ID:4069415
HEAD-WELDED SWAGEABLE END CAP FOR UO$sub 2$-PuO$sub 2$ FUEL ELEMENTS
Technical Report
·
Sun Jul 01 00:00:00 EDT 1962
·
OSTI ID:4742991