Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Medium-Energy Physics Program progress report, February 1--April 30, 1975

Technical Report ·
DOI:https://doi.org/10.2172/4100591· OSTI ID:4100591
Operation, modifications, and research efforts at the Clinton P. Anderson Meson Physics Facility (LAMPF Linac) are reported. A large maintenance effort was made in cleaning and upgrading the rf system, and numerous improvements were made in the beam injection, monitoring, and transport systems. Advancements were made on beam dynamics problems, and optics calculations and design studies resulted in a number of hardware improvements. The major accomplishment of the reporting period was the completion of the shimming and the mapping of the Energetic Pion Channel and Spectrometer (EPICS). Current and future experimental work is described. (PMA)
Research Organization:
Los Alamos Scientific Lab., N.Mex. (USA)
DOE Contract Number:
W-7405-ENG-36
NSA Number:
NSA-33-015387
OSTI ID:
4100591
Report Number(s):
LA--6109-PR
Country of Publication:
United States
Language:
English