Buckling of the Tank 241SY101 primary liner
Technical Report
·
OSTI ID:40668
This document describes the computation of the buckling pressure of the primary liner of Tank 241SY101. It describes the calculation of the negative gauge pressure required to buckle the liner. A negative pressure may develop inside the tank when water is sprayed on the hydrogen mitigation pump during its removal. Calculations indicate that the liner will buckle at 23,442 Pa, or 239 cm of water.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 40668
- Report Number(s):
- WHC-SD-WM-ER--394; ON: DE95010229
- Country of Publication:
- United States
- Language:
- English
Similar Records
Structural analysis and evaluation of the 241SY101 tank annulus heat-up
Miscellaneous component design for Tank 241SY101 pump removal
Structural analysis of color video camera installation on Tank 241SY101 (2 volumes)
Technical Report
·
Wed Oct 19 00:00:00 EDT 1994
·
OSTI ID:10194710
Miscellaneous component design for Tank 241SY101 pump removal
Technical Report
·
Wed Mar 01 23:00:00 EST 1995
·
OSTI ID:34303
Structural analysis of color video camera installation on Tank 241SY101 (2 volumes)
Technical Report
·
Thu Aug 18 00:00:00 EDT 1994
·
OSTI ID:10194768