Miscellaneous component design for Tank 241SY101 pump removal
A mixer pump has been used to mitigate the hydrogen build-up in tank 241SY101 (SY101), located in the 200 West Area of the Hanford Site. New equipment is being prepared for the removal, transport, storage, and disposal of the test pump. The disposal equipment for the test pump now in tank SY101 includes a shipping container, a strong back, a lifting beam, a test weight, container support stands, a modified mock-up pump, a flexible receiver blast shield, a lifting yoke, and a yoke brace. The structural evaluations of container and strong back are detailed in another supporting document (WHC 1994a), the engineering analyses of flexible receiver blast shield/lifting yoke and yoke brace are given in other supporting documents (WHC 1994b, WHC 1994c), respectively. Engineering tasks that were contracted to Advanced Engineering Consultants (AEC) include the design and analysis of the following. Two spreader-beam lifting devices. a Container test weight. Container support saddles. Mock-up pump modification. This report documents the work description, design basis, assumptions, and design calculations provided by AEC for the above components. All AEC documents appear in Appendix A. Additional work conducted by Westinghouse Hanford Company (WHC) on the modified container test weight, modification to the mock-up pump, the removable support for the transport assembly, and saddle modification for air pallets also are included in this document.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 34303
- Report Number(s):
- WHC-SD-WM-DA--168; ON: DE95008425
- Country of Publication:
- United States
- Language:
- English
Similar Records
Structural analysis: Flexible receiver yoke brace for the 241SY101 mixer pump
Analysis of the flexible receiver lifting yoke and blast shield assembly. Tank 241SY101
Buckling of the Tank 241SY101 primary liner
Technical Report
·
Fri Sep 09 00:00:00 EDT 1994
·
OSTI ID:10194496
Analysis of the flexible receiver lifting yoke and blast shield assembly. Tank 241SY101
Technical Report
·
Wed Mar 01 23:00:00 EST 1995
·
OSTI ID:33141
Buckling of the Tank 241SY101 primary liner
Technical Report
·
Sun Dec 18 23:00:00 EST 1994
·
OSTI ID:40668