Results are presented of the 2-inch (50 millimeter) diameter baseline (reference) and `typical field installation` orifice meter calibrations. The baseline calibration orifice coefficient tests were run with a long straight upstream meter tube length and a tube bundle straightening vane placed in the inlet to remove swirl. The baseline data were used to qualify the flow facility and to calculate the percentage deviation from baseline value for the orifice meter installation effects tests.
- Research Organization:
- Southwest Research Inst., San Antonio, TX (United States)
- OSTI ID:
- 406037
- Report Number(s):
- PB--97-104954/XAB; CNN: Contract GRI-5095-271-3363
- Country of Publication:
- United States
- Language:
- English
Similar Records
Orifice meter installation effects in the GRI MRF
Orifice meter installation effects: Sliding vane test with a 17 d meter tube and a 19 tube bundle straightening vane downstream of a plug valve and a 90 degree elbow valve stem parallel to the elbow plane. GRI metering Research Facility Program. Topical report. Technical memo
Metering Research Facility Program. Orifice meter installation effects: Ten-inch sliding flow conditioner tests. Technical memorandum, January-June 1996
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:443583
Orifice meter installation effects: Sliding vane test with a 17 d meter tube and a 19 tube bundle straightening vane downstream of a plug valve and a 90 degree elbow valve stem parallel to the elbow plane. GRI metering Research Facility Program. Topical report. Technical memo
Technical Report
·
Mon Nov 30 23:00:00 EST 1992
·
OSTI ID:418968
Metering Research Facility Program. Orifice meter installation effects: Ten-inch sliding flow conditioner tests. Technical memorandum, January-June 1996
Technical Report
·
Thu Oct 31 23:00:00 EST 1996
·
OSTI ID:445825