Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

SM-2 6000 & 12000 eKW NUCLEAR POWER PLANT PRIMARY SYSTEM DESIGN

Technical Report ·
OSTI ID:4026310
The development studies for an SM-2 Nuclear Power Plant primary system are summarized. The studies include the following: horizortal steam generator, safety and alarm system, decontamination methods, waste disposal, preassembly and packaging, vapor container, vertical steam generator and feedwater control system, pressurizer development and design studies, fuel handling, superheater, and instrumertation. The design analysis for the main primary system and the primary auxiliary sysdescriptions. The results obtained from the development studies and design analysis are included for a 6000 kw(e) plant design which utilizes a single 28 Mw(t) reactor system, and for the preliminary design of a 12,000 kw(e) plant design which utilizes two identical 28 Mw(t) reactor systems. (auth)
Research Organization:
Alco Products, Inc., Schenectady, N.Y.
NSA Number:
NSA-15-024579
OSTI ID:
4026310
Report Number(s):
APAE-74(Vol.I)
Country of Publication:
United States
Language:
English

Similar Records

SM-2 6000 eKW (NET) NUCLEAR POWER PLANT FINAL DESIGN SECONDARY SYSTEM
Technical Report · Thu Jun 01 00:00:00 EDT 1961 · OSTI ID:4026278

SM-2 12000 eKW POWER COMPLEX NUCLEAR POWER PLANT SECONDARY SYSTEM DESIGN
Technical Report · Thu Jun 01 00:00:00 EDT 1961 · OSTI ID:4026277

SM-2 PREASSEMBLY AND PACKAGING STUDY
Technical Report · Sun May 01 00:00:00 EDT 1960 · OSTI ID:4164293